"""Wagner-Whitin dynamic programming solver for uncapacitated single-item lot sizing.
This module implements the classical Wagner-Whitin algorithm (1958) that solves
the uncapacitated single-item lot sizing problem optimally in O(T²) time.
References:
Wagner, H. M., & Whitin, T. M. (1958).
Dynamic version of the economic lot size model.
Management science, 5(1), 89-96.
"""
from __future__ import annotations
import logging
import numpy as np
from discrete_optimization.generic_tools.do_solver import SolverDO
from discrete_optimization.generic_tools.result_storage.result_storage import (
ResultStorage,
)
from discrete_optimization.lotsizing.production_solution import ProductionDecision
from discrete_optimization.lotsizing.uncapacitatedsingleitem.problem import (
UncapacitatedSingleItemLSP,
UncapacitatedSingleItemSolution,
)
logger = logging.getLogger(__name__)
[docs]
class WagnerWhitinSolver(SolverDO):
"""Wagner-Whitin dynamic programming solver.
This solver computes the optimal solution for the uncapacitated single-item
lot sizing problem in O(T²) time using dynamic programming.
The algorithm exploits the Zero Inventory Ordering (ZIO) property:
In an optimal solution, production in period t (if any) should satisfy
demand for an integer number of consecutive future periods, with zero
inventory before period t.
This means we only need to consider T² possible solutions (for each period,
consider producing to satisfy demand up to each future period).
The dynamic programming recurrence is:
f[t] = min over k in [0, t) of [f[k] + cost(k, t)]
Where:
f[t] = minimum cost to satisfy demands from period 0 to t-1
cost(k, t) = cost to produce in period k to satisfy demands k to t-1
= setup_cost[k] + production_cost[k] * sum(demands[k:t])
+ sum of inventory costs for holding from k to t
Base case: f[0] = 0 (no cost before first period)
Time complexity: O(T²) where T is the horizon
Space complexity: O(T)
"""
problem: UncapacitatedSingleItemLSP
def __init__(self, problem: UncapacitatedSingleItemLSP, **kwargs):
"""Initialize Wagner-Whitin solver.
Args:
problem: Uncapacitated single-item lot sizing problem instance
**kwargs: Additional solver parameters (ignored)
"""
super().__init__(problem, **kwargs)
[docs]
def solve(self, **kwargs) -> ResultStorage:
"""Solve the problem optimally using Wagner-Whitin algorithm.
Args:
**kwargs: Additional parameters (ignored)
Returns:
ResultStorage containing the optimal solution
"""
logger.info("Running Wagner-Whitin DP algorithm...")
T = self.problem.horizon
item = 0 # Single item
# Precompute cumulative demands for efficiency
demands = [self.problem.get_demand(item, t) for t in range(T)]
cumul_demands = np.cumsum([0] + demands) # cumul_demands[t] = sum(demands[0:t])
# DP table: f[t] = minimum cost to satisfy demands from 0 to t-1
f = [float("inf")] * (T + 1)
f[0] = 0.0 # Base case: no cost before first period
# Backtracking: best_k[t] = best production period for subproblem ending at t
best_k = [-1] * (T + 1)
# Dynamic programming: compute f[t] for t = 1, 2, ..., T
for t in range(1, T + 1):
# Try all possible last production periods k in [0, t)
for k in range(t):
# Cost to produce in period k to satisfy demands from k to t-1
cost_k_t = self._compute_production_cost(k, t, cumul_demands)
# Total cost: cost up to k + cost to produce k to t
total_cost = f[k] + cost_k_t
# Update if better
if total_cost < f[t]:
f[t] = total_cost
best_k[t] = k
# Backtrack to find optimal production plan
production_decisions = []
t = T
while t > 0:
k = best_k[t]
if k == -1:
raise RuntimeError(f"No valid production plan found for period {t}")
# Produce in period k to satisfy demands from k to t-1
quantity = int(cumul_demands[t] - cumul_demands[k])
if quantity > 0:
production_decisions.append(
ProductionDecision(item=0, period=k, quantity=quantity)
)
t = k
# Reverse to get chronological order
production_decisions.reverse()
# Create solution
solution = UncapacitatedSingleItemSolution(
problem=self.problem,
production_periods=[p.period for p in production_decisions],
production_quantities=[p.quantity for p in production_decisions],
)
# Verify solution
optimal_cost = f[T]
computed_cost = solution.compute_total_cost()
logger.info(f"Optimal cost: {optimal_cost:.2f}")
logger.info(f"Computed cost: {computed_cost:.2f}")
logger.info(f"Production periods: {[p.period for p in production_decisions]}")
if abs(optimal_cost - computed_cost) > 1e-6:
logger.warning(
f"Cost mismatch: DP says {optimal_cost:.2f}, "
f"solution says {computed_cost:.2f}"
)
# Create result storage
result_storage = ResultStorage(
mode_optim=self.problem.get_objective_register().objective_sense,
list_solution_fits=[
(solution, self.aggreg_from_dict(self.problem.evaluate(solution)))
],
)
return result_storage
def _compute_production_cost(
self,
k: int,
t: int,
cumul_demands: np.ndarray,
) -> float:
"""Compute cost to produce in period k to satisfy demands from k to t-1.
Args:
k: Production period
t: End period (exclusive)
cumul_demands: Cumulative demands array
Returns:
Total cost (setup + production + inventory)
"""
item = 0
# Setup cost in period k
setup_cost = self.problem.get_setup_cost(item, k)
# Production quantity: sum of demands from k to t-1
quantity = cumul_demands[t] - cumul_demands[k]
# Production cost
production_cost_per_unit = self.problem.get_production_cost_per_unit(item, k)
production_cost = production_cost_per_unit * quantity
# Inventory cost: for each period p in [k, t-1], we hold inventory
# Inventory at end of period p = demands still to be delivered = sum(demands[p+1:t])
# which is: cumul_demands[t] - cumul_demands[p+1]
inventory_cost = 0.0
for p in range(k, t):
# Inventory at end of period p (demands p+1 through t-1 not yet delivered)
inv = cumul_demands[t] - cumul_demands[p + 1]
inv_cost_per_unit = self.problem.get_inventory_cost_per_unit(item, p)
inventory_cost += inv * inv_cost_per_unit
total_cost = setup_cost + production_cost + inventory_cost
return total_cost